Sun. Jun 14th, 2026
  • Government has decided to remove the license requirement for Power Generating Companies on Dedicated Transmission Lines.
  • The government has decided to remove the requirement of a license to operate and maintain the dedicated transmission lines by power-generating companies to connect with the grid.
  • The requirement to remove the license will promote ease of doing business for the industry and help in more job creation and faster industrial growth.
  • The new rules have been announced by the Union Power Minister RK Singh.
  • A power generating company or a person setting up a captive generating plant or an Energy Storage System with a load of less than twenty-five Megawatts shall not be required to obtain the license.
  • The Government has already brought down the losses of the distribution companies from 27 per cent in 2014 to 15.41 per cent in 2022-23.
  • Since 2014, around 16.93 lakh crore rupees of investment have been made in the power sector in India.

Login

error: Content is protected !!